Dredging of the Pirita River

Description

In February 2015, Eurometrus began work on deepening the Pirita River. The last time dredging was carried out only in 1984. As a result of the entire project, Eurometrus carried out work from the Olympic flame to the Pirita bridge and transferred 20,000 cubic meters of soil, and the river’s depth was increased to 3.5 meters.